Для открытия контактов резюме необходимо приобрести доступ к базе
Не указана
Гражданство
Россия
Тип занятости
Полная занятость, Проектная работа/разовое задание
Мужчина, 53 года, родился 27 февраля 1971
Город: Тула
Опыт работы
26 лет 10 месяцев
GasPromNeft General Contractor
QA/QC
С 01.09.2021 по настоящее время (3 года 2 месяца)
Procurement
GasPromNeft General Contractor
QA/QC
С 01.09.2021 по настоящее время (3 года 2 месяца)
Procurement
OMSK DCC Project DAELIM Industrial Co., Ltd.
QA/QC Piping inspector
С 01.01.2020 по 01.09.2020 (8 месяцев)
Position duties: - Develop and gain Company approval of Testing Procedures and Work Method Statements; - Producing, reviewing and approving with Contractor/Subcontractor Work Procedures, Work Method Statements (WMS), Inspection and Test Plans (ITP), Quality Plans; - Providing Quality Audits and producing Non-Conformance and Corrective Action Reports; - Providing QA/QC kickoff meetings with Contractor /Subcontractor to rise Quality Level on site; - Technical Supervision on Contractor/Subcontractor Quality Control and Quality Assurance works - Client Technical supervision on coating, civil, hydro testing works, fireproofing, Structural Steel fabrication and installation works on site - Technical Supervision on material and equipment acceptance - Technical Supervision on contractor and subcontractor personnel qualifications certificates acceptance - Technical Supervision on contractual quality documentation accordance to Quality programs, ITP and Specifications; - Technical Supervision on Russian quality documentation according to national and local regulations; - Technical Supervision on accordance performed work to work procedures approved by Client. - Translating technical documentation from Russian into English and vice versa. - Witnessing inspections providing by Contractor or Subcontractor. - Verifying punch list items are ready to be closed - Supervision on work packages preparation for further handing over to Operation group - Control Safety rules and regulations during work performance on site. - Preparation and Follow up with Subcontractor, Commissioning group for sub-system/system completion through matrix. - To enter punch list in Database. - To update punch list as and when required. - Compile & consolidate punch lists, & provide auditable trail to ensure that all punch list items are recorded & signed off by authorized personnel upon completion. - Receives, reviews, sorts, issues, and manages resolution of the punch list with involved parties. - Updating of Sub-system/ System Completion as per defined criteria for static, dynamic, process requirements. - Maintaining Walk down Status, leading NOMC Walkthrough with CSU, Operation, Maintenance team. - Follow up for client Prioritized subsystem with Construction, Commissioning to handover on schedule. - Satisfying team all MC book Review comments incomplete works add in an exception list. - Establishes regular Turnover meetings, Establishes regular Punch List Status meetings. - Develops detailed turnover schedules for systems and sub-systems in accordance with approved commissioning sequence. - Manages, complete, compiles the required Quality Verifying Documents and turns over these in the Turnover Dossiers. - Provides sub-system and system status of remaining construction, commissioning work, outstanding documentations, statistics, and action item. - Ensure all quality control records for the work are progressively accumulated, indexed & available to support a phased systematic acceptance & handover of the plant in accordance with the project Acceptance of the Work Plan. - Using P&ID's plot layouts & other drawings & documents define the construction & commissioning deliverables in the form Systems, Areas, Buildings & Modules. - Responsible for Preparation of Project Final /As-Built Documentation & Electronic Documentation with SAP-DMS, preparation of Documentation Structure as per area / Construction Unit wise - Classify the project documents and arrange in proper location, scan and store the documents in DMS system. - Creation of well-organized filing systems for the Project Documents. - Prepare and update Discipline Certification Matrix. - Preparation of Discipline Acceptance Certificate (DAC), When a discipline is completed and punch list category “A” closed within a Subsystem he shall issue the Discipline Acceptance Certificate according to “Mechanical Completion Status”; - Preparation of Mechanical Completion Certificate (MC). When a discipline’s are completed (Ex. Piping/Mech./Elec./Inst.) and DAC’s are issued, Precommissioning activities are completed and punch list category “A” & “B” are closed and Category “C” Minimum within a Subsystem he shall issue the Mechanical Completion Certificate according to “Mechanical Completion Status”; Preparation of Ready for Start-up (RFSU) When a discipline’s Commissioning are completed (Ex. Piping/Mech./Elec./Inst.) and MC’s are issued, punch list category “A” & “B” “C” are closed within a System/Subsystem he shall issue the Ready For Start-up(RFSU) according to “Mechanical Completion Status” (Note: Issue of RFSU details will find in Handover Procedure). Updating of Punch list management system and certification Traceability matrix provides an indication of completeness of certification. Assurance, by means of visual inspection and destructive and nondestructive tests of coating (thickness, adhesion, dielectric layer continuousness), of fulfillment of all works on the entrusted area according to the plan, to the Consumer demands, to the Contractor’s procedures and specifications, approved by Company during the project realization. Objects: Main Oil and Gas Pipeline Sheet products, Boiler and Pressure Vessels, Stop and Control Valves, Wellhead and Christmas Tree Equipment, Processing Piping, Pipelines, Hardware, Pipe manufacture, Flat steel, Steel Construction.
ACES for FLUOR
QA/QC
С 01.08.2019 по 01.11.2019 (3 месяца)
Objects: Main Oil and Gas Pipeline Sheet products, Boiler and Pressure Vessels, Stop and Control Valves, Wellhead and Christmas Tree Equipment, Processing Piping, Pipelines, Hardware, Pipe manufacture, Flat steel, Steel Construction.
ООО "ЗСНХ". СИБУР
QA/QC Engineer
С 01.09.2016 по 01.12.2017 (1 год 3 месяца)
Objects: Main Oil and Gas Pipeline Sheet products, Boiler and Pressure Vessels, Stop and Control Valves, Wellhead and Christmas Tree Equipment, Processing Piping, Pipelines, Hardware, Pipe manufacture, Flat steel, Steel Construction. Preparation and Follow up with Subcontractor, Commissioning group for sub-system/system completion through matrix. To enter punch list in Database. To update punch list as and when required. Compile & consolidate punch lists, & provide auditable trail to ensure that all punch list items are recorded & signed off by authorized personnel upon completion. Receives, reviews, sorts, issues, and manages resolution of the punch list with involved parties. Updating of Sub-system/ System Completion as per defined criteria for static, dynamic, process requirements. Maintaining Walk down Status, leading NOMC Walkthrough with CSU, Operation, Maintenance team. Follow up for client Prioritized subsystem with Construction, Commissioning to handover on schedule. Satisfying team all MC book Review comments incomplete works add in an exception list. Establishes regular Turnover meetings, Establishes regular Punch List Status meetings. Develops detailed turnover schedules for systems and sub-systems in accordance with approved commissioning sequence. Manages, complete, compiles the required Quality Verifying Documents and turns over these in the Turnover Dossiers. Provides sub-system and system status of remaining construction, commissioning work, outstanding documentations, statistics, and action item. Ensure all quality control records for the work are progressively accumulated, indexed & available to support a phased systematic acceptance & handover of the plant in accordance with the project Acceptance of the Work Plan. Using P&ID's plot layouts & other drawings & documents define the construction & commissioning deliverables in the form Systems, Areas, Buildings & Modules. Responsible for Preparation of Project Final /As-Built Documentation & Electronic Documentation with SAP-DMS, preparation of Documentation Structure as per area / Construction Unit wise Classify the project documents and arrange in proper location, scan and store the documents in DMS system. Creation of well-organized filing systems for the Project Documents. Prepare and update Discipline Certification Matrix. Preparation of Discipline Acceptance Certificate (DAC), When a discipline is completed and punch list category “A” closed within a Subsystem he shall issue the Discipline Acceptance Certificate according to “Mechanical Completion Status”; Preparation of Mechanical Completion Certificate (MC). When a discipline’s are completed (Ex. Piping/Mech./Elec./Inst.) and DAC’s are issued, Precommissioning activities are completed and punch list category “A” & “B” are closed and Category “C” Minimum within a Subsystem he shall issue the Mechanical Completion Certificate according to “Mechanical Completion Status”; Preparation of Ready for Start-up (RFSU) When a discipline’s Commissioning are completed (Ex. Piping/Mech./Elec./Inst.) and MC’s are issued, punch list category “A” & “B” “C” are closed within a System/Subsystem he shall issue the Ready For Start-up(RFSU) according to “Mechanical Completion Status” (Note: Issue of RFSU details will find in Handover Procedure). Updating of Punch list management system and certification Traceability matrix provides an indication of completeness of certification. Assurance, by means of visual inspection and destructive and nondestructive tests of coating (thickness, adhesion, dielectric layer continuousness), of fulfillment of all works on the entrusted area according to the plan, to the Consumer demands, to the Contractor’s procedures and specifications, approved by Company during the project realization. Assurance, by means of visual inspection and destructive and nondestructive tests of coating (thickness, adhesion, dielectric layer continuousness), of fulfillment of all works on the entrusted area according to the plan, to the Consumer demands, to the Contractor’s procedures and specifications, approved by Company during the project realization. Inspection of painting quality conformance to the Company and Contract demands. Supervision over equipment use, namely: welding, nondestructive and destructive tests, hydratests, covering and painting, welding procedures and welders attestation, independent checking of quality maintenance, as well as checking and ratification of documentation (tests programs and quality maintenance plans). Welding procedures and nondestructive tests attestation, including welders attestation. Guaranteeing of fulfillment, ratification and documentation of working-out of the tests on welding procedures and welders attestation. Testing of quality control procedure, provided by Contractor for the purpose of correspondence of quality aspects to requirements of the Contract (Specification, all-Union State Standard, API, ASME, etc.)
ОАО "Интертек", г. Москва
QA/QC Engineer; Senior inspector
С 01.10.2011 по 01.08.2016 (4 года 10 месяцев)
Assurance, by means of visual inspection and destructive and nondestructive tests of coating (thickness, adhesion, dielectric layer continuousness), of fulfillment of all works on the entrusted area according to the plan, to the Consumer demands, to the Contractor’s procedures and specifications, approved by Company during the project realization. Inspection of painting quality conformance to the Company and Contract demands. About 300 NCRs were issued during all inspections.
Nord Stream AG
QC inspector
С 01.07.2010 по 01.09.2011 (1 год 2 месяца)
Welding procedures and nondestructive tests attestation, including welders attestation. Guaranteeing of fulfillment, ratification and documentation of working-out of the tests on welding procedures and welders attestation. Assurance, by means of visual inspection and destructive and nondestructive tests of coating (thickness, adhesion, dielectric layer continuousness), of fulfillment of all works on the entrusted area according to the plan, to the Consumer demands, to the Contractor’s procedures and specifications, approved by Company during the project realization. Inspection of painting quality conformance to the Company and Contract demands.
ОАО "Мооди Интернэшнл", г. Москва
QA/QC Engineer; Senior inspector
С 01.04.2005 по 01.06.2010 (5 лет 2 месяца)
- Develop and gain Company approval of Testing Procedures and Work Method Statements; - Producing, reviewing and approving with Contractor/Subcontractor Work Procedures, Work Method Statements (WMS), Inspection and Test Plans (ITP), Quality Plans; - Providing Quality Audits and producing Non-Conformance and Corrective Action Reports; - Providing QA/QC kickoff meetings with Contractor /Subcontractor to rise Quality Level on site; - Technical Supervision on Contractor/Subcontractor Quality Control and Quality Assurance works - Client Technical supervision on coating, civil, hydro testing works, fireproofing, Structural Steel fabrication and installation works on site - Technical Supervision on material and equipment acceptance - Technical Supervision on contractor and subcontractor personnel qualifications certificates acceptance - Technical Supervision on contractual quality documentation accordance to Quality programs, ITP and Specifications; - Technical Supervision on Russian quality documentation according to national and local regulations; - Technical Supervision on accordance performed work to work procedures approved by Client. - Translating technical documentation from Russian into English and vice versa. - Witnessing inspections providing by Contractor or Subcontractor. - Verifying punch list items are ready to be closed - Supervision on work packages preparation for further handing over to Operation group - Control Safety rules and regulations during work performance on site. - Preparation and Follow up with Subcontractor, Commissioning group for sub-system/system completion through matrix. - To enter punch list in Database. - To update punch list as and when required. - Compile & consolidate punch lists, & provide auditable trail to ensure that all punch list items are recorded & signed off by authorized personnel upon completion. - Receives, reviews, sorts, issues, and manages resolution of the punch list with involved parties. - Updating of Sub-system/ System Completion as per defined criteria for static, dynamic, process requirements. - Maintaining Walk down Status, leading NOMC Walkthrough with CSU, Operation, Maintenance team. - Follow up for client Prioritized subsystem with Construction, Commissioning to handover on schedule. - Satisfying team all MC book Review comments incomplete works add in an exception list. - Establishes regular Turnover meetings, Establishes regular Punch List Status meetings. - Develops detailed turnover schedules for systems and sub-systems in accordance with approved commissioning sequence. - Manages, complete, compiles the required Quality Verifying Documents and turns over these in the Turnover Dossiers. - Provides sub-system and system status of remaining construction, commissioning work, outstanding documentations, statistics, and action item. - Ensure all quality control records for the work are progressively accumulated, indexed & available to support a phased systematic acceptance & handover of the plant in accordance with the project Acceptance of the Work Plan. - Using P&ID's plot layouts & other drawings & documents define the construction & commissioning deliverables in the form Systems, Areas, Buildings & Modules. - Responsible for Preparation of Project Final /As-Built Documentation & Electronic Documentation with SAP-DMS, preparation of Documentation Structure as per area / Construction Unit wise - Classify the project documents and arrange in proper location, scan and store the documents in DMS system. - Creation of well-organized filing systems for the Project Documents. - Prepare and update Discipline Certification Matrix. - Preparation of Discipline Acceptance Certificate (DAC), When a discipline is completed and punch list category “A” closed within a Subsystem he shall issue the Discipline Acceptance Certificate according to “Mechanical Completion Status”; - Preparation of Mechanical Completion Certificate (MC). When a discipline’s are completed (Ex. Piping/Mech./Elec./Inst.) and DAC’s are issued, Precommissioning activities are completed and punch list category “A” & “B” are closed and Category “C” Minimum within a Subsystem he shall issue the Mechanical Completion Certificate according to “Mechanical Completion Status”; Preparation of Ready for Start-up (RFSU) When a discipline’s Commissioning are completed (Ex. Piping/Mech./Elec./Inst.) and MC’s are issued, punch list category “A” & “B” “C” are closed within a System/Subsystem he shall issue the Ready For Start-up(RFSU) according to “Mechanical Completion Status” (Note: Issue of RFSU details will find in Handover Procedure). Updating of Punch list management system and certification Traceability matrix provides an indication of completeness of certification. Assurance, by means of visual inspection and destructive and nondestructive tests of coating (thickness, adhesion, dielectric layer continuousness), of fulfillment of all works on the entrusted area according to the plan, to the Consumer demands, to the Contractor’s procedures and specifications, approved by Company during the project realization. Choice of methods and volumes of NDT и RT after assembling, during inspection and industrial safety examination of technical device; the above-mentioned works fulfillment with technical reports and all possible recommendations on elimination of defects. Supervision over observation of the safety measures during UT. Evaluation of competence of operators during NDT. Periodic activity on destructive testing, semi quantitative and quantitative frequency analysis. Supervision over equipment use, namely: welding, nondestructive and destructive tests, hydratests, covering and painting, welding procedures and welders attestation, independent checking of quality maintenance, as well as checking and ratification of documentation (tests programs and quality maintenance plans).
Тульское МНУ "Химволокно"
Начальник лаборатории неразрушающих методов контроля
С 01.12.1997 по 01.04.2005 (7 лет 4 месяца)
Choice of methods and volumes of NDT и RT after assembling, during inspection and industrial safety examination of technical device; the above-mentioned works fulfillment with technical reports and all possible recommendations on elimination of defects. Supervision over observation of the safety measures during UT. Evaluation of competence of operators during NDT. Periodic activity on destructive testing, semi quantitative and quantitative frequency analysis. Supervision over equipment use, namely: welding, nondestructive and destructive tests, hydratests, covering and painting, welding procedures and welders attestation, independent checking of quality maintenance, as well as checking and ratification of documentation (tests programs and quality maintenance plans).
Образование
Университет
Тульский государственный университет
Владение языками
Родной язык
Русский
Иностранные языки
Английский
Дополнительно
Ключевые навыки
Управление отношениями с клиентами
техническое диагностирование
Дополнительная информация
Qualification: Welding Engineer Additional education: Organization Level Validity period NOSTROY C-71-224722 1. Visual-Measuring Control «NOAP NK NIIHIMMASH» III June 2025 2. Ultrasonic Testing «NOAP NK NIIHIMMASH» III June 2025 3. Radiation Testing «NOAP NK NIIHIMMASH» III March 2026 4. Industrial Safety «NOAP NK NIIHIMMASH» Oil-and-Gas, Chemical (NDT) 14.11.2022 5. Welding «AC PROMEXPERT» III Oil-and-Gas, Chemical 17.05.2022 6. Quality Management System Expert-Auditor ISO 9001:2015 and ISO 19011:2011 “Academy”, Samara From 23.04.2020 7. FLUOR - Certificates of Completion: - Pressure Vessels SQS006; - Shop Fab Piping SQS007; - Valves SQS004; - SQS Report Writing SQS008; 8. RINA Inspector Approval Certificates: HSSE, Welding, Coating/Painting, General Mechanical, QA/QC Knowledge, Basic Math Skills. 9. Technical diagnosis. Expert since 2004 year
Похожие резюме
до 50 000 ₽
42 года
Тула
Полный день, Удаленная работа
Последнее место работы
ООО Олеандр, Администратор БД, сентябрь 2007 - февраль 2008
Обновлено
26.11 в 03:16
Был на сайте
Менее недели назад
Опыт работы
19 лет 2 месяца
до 65 000 ₽
25 лет
Тула
Полный день, Гибкий график, Удаленная работа
Последнее место работы
Центр горного машиностроения, Инженер -конструктор, июль 2021 - август 2021
Обновлено
27.10 в 22:42
Был на сайте
Более недели назад
Опыт работы
4 года