Для открытия контактов резюме необходимо приобрести доступ к базе
Не указана
Гражданство
Казахстан
Тип занятости
Полная занятость, Проектная работа/разовое задание
Мужчина, 34 года, родился 22 января 1990
Город: Атырау
Опыт работы
12 лет 9 месяцев
Novus-Bolashak Atyrau
Lead Technical Interface Project Engineer
С 01.06.2023 по настоящее время (1 год 5 месяцев)
Supported/Facilitated submission of RLMU for subsystems for all disciplines from the Technical Interface team, considering the walkdown commitment dates. Supported/Facilitated information requests for expediting site installation queries from design Contractor and Package Suppliers. Conducted site walkdowns with clients to discuss site work, verify, and implement strategies according to TCO specifications on outstanding MC works stages and RFSU/RFO stages. Clearly defined tasks and distributing them to discipline engineers, considering the overloading of each engineer. Handled all internal and external communication within the framework of the project and department and shared it with the team. Settled, monitored, and maintained a responsibility matrix, priority trackers, and process flow for executing all outstanding issues to handover to the OPS balance. Reported to the management of quantity submission RLMU by the required subsystem and implementation technical queries on a weekly and monthly basis. Expedited the quality site construction contractor's work delivery within the change management scope of RFIs/DCN, QVD/ITR, PLI, RLMU, and timing as per the commissioning RFSU/RFO schedule. Facilitated and participated in progress meetings, if required, with 3GP system construction contractor and client. Getting the plan construction contractor schedule for works on weekly or monthly basis. Supported as possible the material management for 3GP construction contractor work, if required clarify the technical details for timely execution. Supported TCO and KPJV engineering for technical clarifications regarding the site works target and completion dates. Worked with integrated document management systems involves multi-disciplinary engineering/commissioning teams and multiple stakeholders, including EPCM, construction contractors and vendors. Worked with complex Systemized drawings with associated deliverables by all Engineering Disciplines. Followed up on accurate updates of SCMT and reporting of status for Blue Zone Focus meetings or other focused System completion meetings. Facilitated with IM Team to correctly assign Contractor on Construction/Commissioning RLMU requirements.
Novus-Bolashak Atyrau
Lead Technical Interface Project Engineer
С 01.06.2023 по настоящее время (1 год 5 месяцев)
Supported/Facilitated submission of RLMU for subsystems for all disciplines from the Technical Interface team, considering the walkdown commitment dates. Supported/Facilitated information requests for expediting site installation queries from design Contractor and Package Suppliers. Conducted site walkdowns with clients to discuss site work, verify, and implement strategies according to TCO specifications on outstanding MC works stages and RFSU/RFO stages. Clearly defined tasks and distributing them to discipline engineers, considering the overloading of each engineer. Handled all internal and external communication within the framework of the project and department and shared it with the team. Settled, monitored, and maintained a responsibility matrix, priority trackers, and process flow for executing all outstanding issues to handover to the OPS balance. Reported to the management of quantity submission RLMU by the required subsystem and implementation technical queries on a weekly and monthly basis. Expedited the quality site construction contractor's work delivery within the change management scope of RFIs/DCN, QVD/ITR, PLI, RLMU, and timing as per the commissioning RFSU/RFO schedule. Facilitated and participated in progress meetings, if required, with 3GP system construction contractor and client. Getting the plan construction contractor schedule for works on weekly or monthly basis. Supported as possible the material management for 3GP construction contractor work, if required clarify the technical details for timely execution. Supported TCO and KPJV engineering for technical clarifications regarding the site works target and completion dates. Worked with integrated document management systems involves multi-disciplinary engineering/commissioning teams and multiple stakeholders, including EPCM, construction contractors and vendors. Worked with complex Systemized drawings with associated deliverables by all Engineering Disciplines. Followed up on accurate updates of SCMT and reporting of status for Blue Zone Focus meetings or other focused System completion meetings. Facilitated with IM Team to correctly assign Contractor on Construction/Commissioning RLMU requirements.
Novus-Bolashak Atyrau
SMP Discipline Technical Interface Engineer
С 01.07.2022 по 01.06.2023 (11 месяцев)
Provided the ITR, RLMU, and site pictures to the TCO 3GP SC owner and stakeholders to confirm that the works per change management Querry (DCN, PCN, RFI) have been completed as per the project requirements for sign off/close in the SCMT system. Closely communicated with the site team to collect the correct information for raising technical queries. Validated the correctness of the assignment impacting the right tags and subsystems. Worked on and updated the status of outstanding ITRs, PLIs, RFIs, RLMUs and TMOCs using required databases and SC tools, such as SCMT and IMDB.
ArcelorMittal Temirtau
Project Manager
С 01.10.2021 по 01.07.2022 (9 месяцев)
Collaborated with the Program Manager to develop a plan, participating in procuring equipment and materials, and carrying out all Power & Energy tasks related to project requirements. Interdisciplinary co-ordination with AMDEC Engineering team, Vendor and Project team for completion of the project on schedule and within budget. Reviewed and signed off on contracts, requests, orders, and other official documents from the vendor/execution company. Appointed qualified individuals to the relevant departments and approved them in accordance with the company's internal guidelines. Reviewed and signing off on monthly cashflow provided by the cost and planning department. Handled negotiations with bidders for the meeting, analyzing, and evaluating their offers. Supported OPS, Planning Cost analyzer in driving all Power & Energy related projects requirements.
FSSA-GATE CONSTRUCTION
Planning Engineer
С 01.01.2021 по 01.06.2021 (5 месяцев)
Participated in regular meetings with clients, managers, supervisors, and the rest of the team to discuss the progress of projects as per the agreed baseline schedule. Analyzed the L1 to L5 schedule and determined the constraints and critical path impact in each level. Collected and analyzed daily and weekly Construction reports from site team supervisors and shared information on the required prioritization milestones/activities as per the approved schedule. Controlled the start & finish dates of milestones/activities if there are constraints and informing the high-level management. Developed the required/established 2WLA/4WLA plan, considering the actual site progress and staff performance. Estimated the work’s scope and determined its duration in accordance with the site team supervisor’s agreement at the site. Discussed with site team supervisors to coordinate, control manpower and their scheduled manhours, and resolve issues that impact project execution.
Bolashak Atyrau – Tengizchevroil
Construction Representative for Civil & Mechanical works
С 01.08.2018 по 01.09.2020 (2 года 1 месяц)
Controlled and managed the activities of BP contractors and ensured that TCO HES safe work practices are followed at onsite and offsite facilities. Controlled and driving the construction activities to meet schedule needs, reporting delays to the Small Capital Project Construction Supervisor and receiving tasks from the Lead Construction Supervisor. Reviewed the JSA and participating in the PTW documentation system as FOD and PIC to sign/approve BPs' Contractor request for SOW implementation at site. Ensuring that PTW meets all TCO safety requirements by following up on all safety precautions. Ensured all construction activities are following TCO and RoK construction regulatory requirements. Participated in/facilitating meetings, toolbox discussions, and closely working with each department (OPS, Turnover, QA/QC, Procurement/Material, Planning, Survey, HES, Engineering, etc.) to support the safe and timely completion of the project according to the agreed schedule. Ensured that the WRP/site team is authorized to perform the required special work (such as working at heights, confined spaces, earthwork, hot work, and so on). Discussed the scheduled construction work for the day. Considering the 2WLA or 4WLA schedule provided by the contractor ahead of time and the weekly work plan, which was discussed during the meeting on the progress of work. Reviewed constraints that can impact the completion of the project and taking necessary action as site supervisor. Organized Construction Walkdowns in coordination with the Project Engineer, Turnover Coordinators, and Operation Staffs based on Contractor MC Notifications and Project Construction schedules and handing over to Operation balance. Meeting with business partner management to coordinate resources and resolve issues that impact project execution.
Teknokon Group International
Field Engineer (Mechanical, Piping & Tanks works)
С 01.01.2018 по 01.07.2018 (6 месяцев)
Prepared the method statement (MS) for the erection of Piping & tank works based on the required company procedures, with a focus on safety aspects. Closely worked & supported the site crew with approved project procedures and updated project drawings. Preparation of requested sketches from site WRP representatives, mostly for scaffolding activities. Analyzed the technical query (TQ) from the site team and provided a response according to approved instructions from the company's engineering. If there is an impact on project documentation, it will usually affect the project drawings - requesting for approved RLMU drawings to be shared with the site team to implement. Participated in the meeting regarding the progress of the site and instructing the crew on priority tasks according to the updated schedule. Ensured that all unfinished SOWs are closed in accordance with the punch lists issued as a result of walkdowns. Daily reports and preparation of weekly reports, including site progress reports, MHR of personnel, and required main equipment used for project requirements.
RENCO KAT
QA/QC CSA inspector
С 01.07.2017 по 01.12.2017 (5 месяцев)
Reviewed and followed CSA activities according to the approved Installation Work Pack (IWP) system and Inspection test plan (ITP) based on quality perspectives at the site. After finishing each activity, preparing, and submitting the necessary QVD/ITR in accordance with the approved ITP for company approval.
Orion Group - Isker Group
QA/QC Procurement Material Specialist
С 01.10.2016 по 01.06.2017 (8 месяцев)
Reviewed bidders' offers and evaluated the project materials required based on quality perspectives in accordance with the company's procedures, drawings, and specific requirements. Gathered all documents (certificates, test reports, vendor manuals and so on) related to project materials and entered information into the Material Management database.
Saipem Kazakhstan Branch
Asset Management Operation System Operator
С 01.01.2015 по 01.09.2016 (1 год 8 месяцев)
Prepared and submission workorders through AMOS to the chief mechanic and electrical departments as required for periodic inspections. Prepared and submission of unexpected workorders through AMOS, and negotiation with associated persons to include them in the agreed schedule plan. Shared unexpected workorder information to Saipem locations worldwide as a benchmark or lesson learned. Prepared & submission of weekly/monthly reports, KPI reports and drilling operations performance statistics for client review. Responsibility for storing and organizing all documents (certificates, manuals, procedures, and so on) in the company database in a correct manner. Updated the inventory of rig equipment and tools in the company database. Prepared & sending requests for damages and maintenance of drill AC/DC motors, wire ropes, mud pumps, pipes, bushings, bearings, and other requested equipment to appropriate vendor service companies. Checked and controlled that all measurement instruments are correctly managed and calibrated. Updating the database of calibration certificate dates that have expired.
IGS Corporation
QA/QC Engineer
С 01.05.2014 по 01.12.2014 (7 месяцев)
Developed quality procedures and ITPs according to project requirements. Submission quality procedures and ITPs for client review and comment. Negotiation with company stakeholders regarding project preparation procedures and ITP. Resolved quality issues related to the quality department caused by the project and prepared the necessary response for the client.
NSS LTD
QA/QC Civil & Mechanical Inspector & Turnover specialist (Smart)
С 01.06.2012 по 01.05.2014 (1 год 11 месяцев)
QA/QC Civil & Mechanical Inspector: Checked and controlled construction-installation activities in civil and mechanical disciplines on field as per approved company procedures and ITP. Upon completion of each activity, prepare and submit the necessary QVD/ITR in accordance with the approved ITP. Turnover specialist: Collected all finalized QVD/ITR, RLMU, and relevant documents by area and using the required system for dossier preparation and initiation. Controlled all outstanding project documents to ensure their completion according to the project requirements system and procedure.
Образование
Университет
Евразийский Национальный Университет им. Л.Н. Гумилева
Университет
Атестат Технадзора
Университет
Акимат по Павлодарской области (ГАСК)
Владение языками
Родной язык
Казахский
Иностранные языки
Английский, Итальянский, Русский
Дополнительно
Ключевые навыки
Behavioral skills: communication
Team leadership
conflict resolution
work-life balance
time-managemen
computer skills: ms office application (word
Ms excel
Ms outlook
Знание ms project, ms excel, ms word, ms outlook, autocad.
Ms powerpoint
etc.)
Ms power bi
language skills: kazakh
Speak russian
Business english
and turkish
Дополнительная информация
Знание строительных технологий, организация учета и списания материалов, ведение строительной деятельности на объекте, контроль входящей документации, анализ и контроль договорных обязательств, аудит качества работ, снабжение материалами и оборудованием, координация заказчиков и субподрядчиков, создание исполнительной документации по строительным работам. Работа с чертежами любой степени сложности. Работа и взаимодействие с лабораториями по неразрушающим методам контроля. Знаком со многими ГОСТами, СНИПами, СН, ТУ, спецификациями и процедурами компанией ТШО. В личном пользовании имеется Литература Нормативных Документов Казахстана. Ознакомлен с базой данных ТШО по введению Контроля за документацией Приема Сдачи и отслеживаемости процентовки законченной системы . При введении контроля и сдачи документации обязательно веду контроль только по утвержденным Процедурам приемки документации ТШО и Последней ревизии АКТов и Протоколов Утвержденных отделом (Турновер) и совместно согласованных лиц вносимых свои комментарии в пункты документации непосредственно Групп Контролирующих заполнение и Подписи перечисленных выше документов.Комментарии всех Строительных Групп и Реабилити Группы и ведущих Инженеров по контролю Документации. Частично знаком с Базой Данных Отдела СУЗ. (Тенгизшевроил Система Управления Завершения Проектов).
Похожие резюме
до 350 000 ₽
44 года
Атырау
Полный день
Последнее место работы
Казино "Нью-Стар", Диллер-инспектор, март 2000 - июнь 2007
Обновлено
03.11 в 09:47
Был на сайте
Более недели назад
Опыт работы
26 лет 3 месяца
Не указана
30 лет
Атырау
Полный день
Последнее место работы
ТОО ПК Казэлектриум, Электрик, август 2014 - июль 2015
Обновлено
09.11 в 15:01
Был на сайте
Более недели назад
Опыт работы
7 лет 4 месяца
Не указана
44 года
Атырау
Полный день, Гибкий график, Удаленная работа
Последнее место работы
Danai ltd, Lawyer, январь 2001 - январь 2003
Обновлено
26.10 в 15:07
Был на сайте
Более недели назад
Опыт работы
22 года 5 месяцев