Для открытия контактов резюме необходимо приобрести доступ к базе
Не указана
Гражданство
Казахстан
Тип занятости
Полная занятость
Мужчина, 31 год, родился 21 октября 1993
Город: Астана
Опыт работы
7 лет 11 месяцев
Senimdi Kurylys
KSU Workface Planning Engineer
С 01.10.2023 по настоящее время (1 год 1 месяц)
KSU Workface Planning Engineer Working with Installation Job Packs and with EDMS
Senimdi Kurylys
KSU Workface Planning Engineer
С 01.10.2023 по настоящее время (1 год 1 месяц)
KSU Workface Planning Engineer Working with Installation Job Packs and with EDMS
KKS Sicim
Planning Engineer
С 01.09.2023 по 01.10.2023 (1 месяц)
Soon
Velesstroy
Mechanical Completion Walkdown Coordinator
С 01.09.2022 по 01.04.2023 (7 месяцев)
Interfaces with the Project Construction, Turnover Coordinators and Walk Down Engineers to support Walk Down Engineer in organizing walk downs based on Contractor MC Notifications and project schedule. Records all identified punch items during Walk Downs. Supports MCPlus team by providing approved Final Construction Punch List to make sure the final punch list items and their status are accurate in the MCPlus system. Ensures that relevant punch lists of the Final Construction are available along with other punch list requirements as noted in the Punch List procedure. Participates in a pre-walk down meeting to ensure all participants understand the punch list requirements as detailed in the Punch List procedure. Participates in a post walk down meeting following the completion of the walk down to ensure all identified items are finalized, registered and categorized in accordance with the Punch List procedure Participates in Contractor weekly meetings to update Construction and Contractor teams on the status of punch list clearing in support of Mechanical Completions. Day to day monitor and control of punch list (PL) items for the project to ensure that the Subsystem / System dossiers are completed on time, by all disciplines, to meet Project completion date and reporting to Project engineer or CM also providing the status of PL to reporting team. Coordinate walkdown personnel for walkdowns ensuring that all walkdown technicians have the most up to date red line drawings to carry out walkdowns. Liaise with System Completions Team & Operations to notify them of up�coming walkdowns. Liaise with Construction on up-coming MC Walkdowns readiness status and ensure sufficient walkdown resources are available. Receive MC walkdown packages from construction contractor and distribute to relevant discipline leads for review. Collect all the consolidated agreed punch lists issued by all stakeholders after post MC Walkdown meeting and prepare the MC+ Punch list to be uploaded into MC+ Attend punchlist progress / MC meetings with construction contractors for inclusion in MC progress and schedule. Responsible for punch list monitoring on daily basis and priority compliance up to Handover. Ensure that punch lists items are accurate and properly filed and agreed with initiator and closed in system or approval to be obtained and recorded. Coordinate with Construction as System Completions Team representative (when applicable) for punch list clearance to meet target dates Coordinate and expedite with the Commissioning Engineers / Leads to punch list clearance priorities. Take necessary action to close that no open ‘A’ PL items and only agreed ‘B’ and ‘C’ items are remaining at point the SMCC signature. Take necessary action to close that no open ‘B’ PL items and only agreed ‘C’ items are remaining at point the RFC signature. Responsible for coordinating the liquidation, monitoring, audit of punchlist clearance and implementation of punchlist procedures to construction contractors in accordance with the Commissioning handover schedule. Ensure a continuous validation process of punchlist clearance is in operation. Issue punch lists reports to be attached to the Commissioning certificates (when applicable). Daily basis monitor and report punch list progress status by Sub-System/System. Set up systems for reporting on Subsystem certification status.
Worley
Project Measurement Analyst(Milemarker Analyst)
С 01.01.2019 по 01.09.2022 (3 года 8 месяцев)
Setting up and updating the progress program (MileMarker) with the quantities installed and % complete in the different milestones. Generate the reports with data that is used by the Planners / Schedulers to analyze the progress, performance and to create the project curves; Ensures that the timely collection of accurately updated information is incorporated into programs, analyses the effect of the updated information and highlights and adverse situations to the MileMarker Coordinator; Ensures the timely preparations of reports, indicating budgeted, actual and forecast; Assist with preparation of narratives for reports, analyses achievements and their likely effects on remaining scope of work; Incorporates changes to the scope of work into Milemarker, and analyses their effects; Perform any other duties as assigned by line manager.
Kazcomservice
Workface Planning Engineer in C&P
С 01.10.2018 по 01.12.2018 (2 месяца)
Monitoring the progress periodically and reporting the progress periodically. Accumulating, collecting and analyzing data and information required for planning. Managing and supporting the subcontractors, vendors and other teams in terms of planning and reporting issues. Preparing weekly reports, tracking logs. Using software SPC (SmartPlantConstruction) or manually for prepare IWP’s and execute packages. Prepare, Execute and track 3wla every week. Coordinating FIWP execution with field supervision. Monitoring and controlling FIWP and advising appropriate parties. Coordinating activities with field supervision, resource coordinators, project controls, quality assurance other planners, and operations personnel. Modifying, reviewing or adjusting FIWP as necessary. Developing IWP templates. Preparing required project IWP, which includes determining required activities, resources, special conditions, quality control, risk planning, and interdependencies. Using O3 insight software to close IWPs. Deciding on the most appropriate engineering techniques and sequences of activities for each project stage. Monitor day to day construction progress and prepare the weekly report. Maintain and record update of site work progress. Prepare IWP (Installation Work Package). Detection constraints. Report to the project manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work Participate in project meeting and discussions with client as required.
ТОО Сенимди Курулыс
Workface planning Engineer (Civil department, Gathering system)
С 01.10.2017 по 01.07.2018 (9 месяцев)
Monitoring the progress periodically and reporting the progress periodically. Accumulating, collecting and analyzing data and information required for planning. Managing and supporting the subcontractors, vendors and other teams in terms of planning and reporting issues. Preparing weekly reports, tracking logs. Using software SPC (SmartPlantConstruction) or manually for prepare IWP’s and execute packages. Prepare, Execute and track 3wla every week. Coordinating FIWP execution with field supervision. Monitoring and controlling FIWP and advising appropriate parties. Coordinating activities with field supervision, resource coordinators, project controls, quality assurance other planners, and operations personnel. Modifying, reviewing or adjusting FIWP as necessary. Developing IWP templates. Preparing required project IWP, which includes determining required activities, resources, special conditions, quality control, risk planning, and interdependencies. Using O3 insight software to close IWPs. Deciding on the most appropriate engineering techniques and sequences of activities for each project stage. Monitor day to day construction progress and prepare the weekly report. Maintain and record update of site work progress. Prepare IWP (Installation Work Package). Detection constraints. Report to the project manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work Participate in project meeting and discussions with client as required. Special WFP Trainings: Introduction to WFP, Simulation WFP Life-Cycle for CM Team Engagement in WFP, Overview of WFP Interface with Material Management for Company and Contractors, CWP/IWP Scoping, IWP Development
Wal-Mart(Соединенные Штаты Америки)
Inventory Management System
С 01.05.2013 по 01.09.2013 (4 месяца)
Responsible for offloading merchandise from delivery vans. Position stock in a suitable location. Responsible for keeping a correct inventory control. Categorize products in bin by department. Responsible for labeling merchandise. Responsible for the daily scanning of merchandise. Make the adjustment of inventory levels. Execute all inventory programs of Walmart. Retrieve products from inventory bins. Use the handheld scanner to pinpoint items needed on the sales floor. Responsible for monitoring any areas where merchandise decrease. Monitor the potential risk to merchandise. Report identified problems and in-store loss to management. Take necessary security measures to safeguard security of merchandise and prevent loss. Maintain safety standards for ensuring safeguard and cleanliness of the store. Secure merchandise on display. Ensure security of ladders. Remove pallets that are empty. Ensure merchandise are stabilized on risers, features, and on high walls. Remove cardboards and trash from sales floor. Keep floor neat, clean, and dry. Communicate with customers on questions on merchandise and locations of merchandise on the sales floor. Verify in-stock for customers on request. Responsible for retrieval of items from storage. Stock merchandise accurately on the shelf, racks, bin, and cases. Ensure regular restocking of merchandise. Provide assistance regarding product prices and availability. Ensure accurate and efficient stocking of merchandise in all departments. Responsible for setting up products display. Pull merchandise from the riser.
Renaissance
Bell boy
С 01.06.2012 по 01.08.2012 (2 месяца)
Соблюдение этики, встречать гостей, провести до номера
Образование
Университет
Академия Фрича Моджевскиего в Кракове
Университет
Университет Информационных Технологий и Менеджмента в Жешуве
Университет
Московский Колледж Управления и Новых Технологий
Владение языками
Родной язык
Казахский
Иностранные языки
Английский, Польский, Русский
Дополнительно
Ключевые навыки
Motivation
business communication
Владение ms excel
Знание ms project, ms excel, ms word, ms outlook, autocad.
3d drawing
Adobe indesign indesign adobe photoshop adobe illustrator ms powerpoint пользователь пк графические
3d-графика
adobe acrobat
опытный пользователь пк (word, excel, internet и др.);
coreworx
milemarker
edms
Дополнительная информация
Хобби: читать книги, бегать по утрам, скейтбординг, защита природы. Личные качества: коммуникабельный, ответственный, вежливый, настойчивый Hobby: read books, running, skaitboarding, environment. Personal qualities: communicable, responsible, polite, persistent.
Похожие резюме
до 1 000 000 ₽
28 лет
Астана
Полный день
Последнее место работы
УГД по Алмалинскому району, Производственная практика на должности специалиста юридичекого отдела Управления государственных доходов, июль 2017 - март 2018
Обновлено
05.11 в 03:04
Был на сайте
Более недели назад
Опыт работы
9 лет 5 месяцев
до 350 000 ₽
29 лет
Астана
Полный день
Последнее место работы
КГП Балхаш Энерго, Электромонтер, апрель 2014 - сентябрь 2014
Обновлено
26.10 в 09:03
Был на сайте
Более недели назад
Опыт работы
10 лет 11 месяцев
до 450 000 ₽
32 года
Астана
Полный день
Последнее место работы
Цеснабанк, АО, Младший специалист Управления автокредитования, июнь 2014 - октябрь 2014
Обновлено
29.10 в 23:28
Был на сайте
Более недели назад
Опыт работы
12 лет 7 месяцев