Для открытия контактов резюме необходимо приобрести доступ к базе

  • Открывайте только нужные вам целевые контакты
  • Контакты открываются навсегда
  • Низкая стоимость
#

Unity программист

Не указана

Гражданство

Россия

Тип занятости

Полная занятость, Частичная занятость, Проектная работа/разовое задание

Мужчина, 51 год, родился 27 сентября 1973

Город: Кстово

Опыт работы

14 лет 11 месяцев

Novaenergies Arctic LNG2 project

Electrical Commissioning Senior Supervisor

С 01.12.2022 по 01.07.2024 (1 год 7 месяцев)

Interaction with the contractor for the implementation of NDT systems for electric heating of pipelines. Preparation of all necessary documentation for the implementation of the NDT and control of the database upon completion of work. Coordination of work with the construction department. Performing preparatory work on voltage supply to electric heating systems of pipelines. Coordination of closing the issues of the defective statement with the construction department at the controlled site.

Novaenergies Arctic LNG2 project

Electrical Commissioning Senior Supervisor

С 01.12.2022 по 01.07.2024 (1 год 7 месяцев)

Interaction with the contractor for the implementation of NDT systems for electric heating of pipelines. Preparation of all necessary documentation for the implementation of the NDT and control of the database upon completion of work. Coordination of work with the construction department. Performing preparatory work on voltage supply to electric heating systems of pipelines. Coordination of closing the issues of the defective statement with the construction department at the controlled site.

Novaenergies Arctic LNG2 project

Electrical Supervisor

С 01.07.2022 по 01.12.2022 (5 месяцев)

Responsibilities: Check the Supplier’s material and technical documentation delivery schedule. Check that the same is in line with Construction schedules and contractual commitments; Control and approve the Method Statements submitted by the Subcontractors, ensuring their correct application on the field; ELS ensures the implementation of all the HSE procedures and standards for the areas or activities (subcontractors) of responsibilities; ELS directly participates to the HSE activities at the site as defined for his position in the Site HSE plan and related procedures; Check that the said schedule is kept to, and to promote action to recover any delay; Check that the equipment and manpower employed by the Subcontractor are adequate and that the works performed by the Subcontractor conform to design documents, Safety regulations, and to the Quality level fixed by the same; Perform inspections and sign the necessary certificates as per Site Inspection Plans; Prepare the non-conformity register for each Subcontractor and co-ordinate nonconformity resolution; Detect any design errors, and where possible rectify the same or request the Site Engineer to make the necessary changes.

Novarctic SNC Arctic LNG2 project

Electrical Supervisor

С 01.12.2021 по 01.07.2022 (7 месяцев)

Responsibilities: Check the Supplier’s material and technical documentation delivery schedule. Check that the same is in line with Construction schedules and contractual commitments; Control and approve the Method Statements submitted by the Subcontractors, ensuring their correct application on the field; ELS ensures the implementation of all the HSE procedures and standards for the areas or activities (subcontractors) of responsibilities; ELS directly participates to the HSE activities at the site as defined for his position in the Site HSE plan and related procedures; Check that the said schedule is kept to, and to promote action to recover any delay; Check that the equipment and manpower employed by the Subcontractor are adequate and that the works performed by the Subcontractor conform to design documents, Safety regulations, and to the Quality level fixed by the same; Perform inspections and sign the necessary certificates as per Site Inspection Plans; Prepare the non-conformity register for each Subcontractor and co-ordinate nonconformity resolution; Detect any design errors, and where possible rectify the same or request the Site Engineer to make the necessary changes.

KT-Kinetics Technology

Construction Electrical Supervisor

С 01.09.2020 по 01.11.2021 (1 год 2 месяца)

Check the Supplier’s material and technical documentation delivery schedule. Check that the same is in line with Construction schedules and contractual commitments; Control and approve the Method Statements submitted by the Subcontractors, ensuring their correct application on the field; ELS ensures the implementation of all the HSE procedures and standards for the areas or activities (subcontractors) of responsibilities; ELS directly participates to the HSE activities at the site as defined for his position in the Site HSE plan and related procedures; Check that the said schedule is kept to, and to promote action to recover any delay; Check that the equipment and manpower employed by the Subcontractor are adequate and that the works performed by the Subcontractor conform to design documents, Safety regulations, and to the Quality level fixed by the same; Perform inspections and sign the necessary certificates as per Site Inspection Plans; Prepare the non-conformity register for each Subcontractor and co-ordinate nonconformity resolution; Detect any design errors, and where possible rectify the same or request the Site Engineer to make the necessary changes; Check Subcontractors’ work progress status sheets and sign the same for approval; Manage vendor specialists; Assist the Contract Manager/Engineer in defining new prices, in preparing amendments to subcontracts and in analyzing and discussing claims.

Maire Tecnimont

Construction Electrical Supervisor

С 01.06.2019 по 01.09.2020 (1 год 3 месяца)

Construction Electrical Supervisor. Amur Gas Processing Plant project. • To check that the works performed by the Subcontractor conform to design documents, Safety regulations, and to the Quality level fixed by the same. • Prior to the start of works, to check the Supplier’s material and technical documentation delivery schedule. Check that the same is in line with Construction schedules and contractual commitments. • To manage vendor specialists. • To detect any design errors, and where possible rectify the same or request the Site Engineer to make the necessary changes. • To check Subcontractors’ work progress status sheets and sign the same for approval. • To assist the Contract Engineer in defining new prices, in preparing amendments to subcontracts and in analyzing and discussing claims. • To prepare the non-conformity register for each Subcontractor and co-ordinate non-conformity resolution. • Supervise of HV equipment installation: Disconnectors, Circuit Breakers, Pantographs, XLPE cable. • Supervise of OTLC 110/10 kV Power Transformers installation. • Supervise of modular substation installation • Supervise of OHL transmission lines installation.

Energy Construction

Construction Electrical Superintendent

С 01.01.2019 по 01.05.2019 (4 месяца)

Construction Electrical Superintendent. Primorskaya Thermal Power Plant. • To perform electrical installation works in accordance with design, Safety regulations. • To detect any design errors, and where possible rectify the same or request the Site Engineer to make the necessary changes. • To perform power equipment installation. • To perform earthing system installation. • To perform lighting system installation. • To perform UPS system installation. • To perform Bridge cranes installation

South Tambey LNG

Electrical Supervisor of Construction Team

С 01.12.2016 по 01.11.2018 (1 год 11 месяцев)

«South Tambey LNG», Sabetta, Yamal. HV+LV Electrical Supervisor of Construction Team. Work on the international project on the development of the South Tambey gas condensate field (UTGKM), construction of the three technological line for gas cleaning, separation and liquefaction, the Yamal LNG plant in Sabetta. General description of the work: Management of subcontractors as a general contractor company. Subcontractors perform electrical installation work (power lines, transformer substations, electricity supply to consumers of the 1st category, uninterrupted lines), commissioning and work to eliminate the customer's comments. Interaction with suppliers of electrotechnical equipment, electrotechnical laboratory, presentation of objects to representatives of the customer. Direction and control of electrical installation works: - Provision of visual inspection of the electrical installation works; - Control over the work of subcontractors; - Control during the reception, transmission and testing of electrical equipment; - Checking the performance of electrical work for compliance with procedures, electrical installation technologies, production plans, safety requirements during work; - Checking the results of the work with the quality control department; - Supervision of the safe conduct of related works; - In disputable situations - independent adoption of technical and organizational solutions. Administrative functions: -Report on all identified inconsistencies, work quality control acts, measures to eliminate inconsistencies to the line manager (head of the electrical equipment and instrumentation department); - Monitoring the elimination of comments, inconsistencies, a report on the elimination of identified violations, acceptance of work performed; - Participation in weekly and unscheduled meetings of the expert group on electrical equipment and instrumentation; - Participation in the preparation and coordination of technical requests, instructions for the construction site; - Control of preparation for work in winter conditions. In accordance with the requirements of occupational safety and health; - Direct coordination and signing of work permits for teams of subcontractors. Monitoring the performance of work, monitoring compliance with safety instructions; - Checking and confirming the availability of drawings and project documentation for the production and execution of works in the electronic system EDMS, control over the consumption of materials, as well as control over commissioning; - Daily report to the immediate manager on human, technical, material resources and a report on all activities of subcontractors; - Report to the line manager and coordination on all issues related to the drawings, design decisions and the coordination of technical requests; - Interaction with third-party companies - general contractors and subcontractors for claims, project inconsistencies, joint work in related areas, decision-making in case of disputable situations; - Interaction with the operating services of the client company. For example: the quality control department, the commissioning department, HSE department); - Reporting of closed forms of acceptance and quality control to the EasyPlant electronic system; - Additional functions, if necessary, and at the request of the management at the construction site. Organization and control of installation of “SIEMENS” and “ABB” power transformers, installation of “LS Cable” busducts. Mounting of cable boxes, heating and earthing cables. Preparing of mounted equipment for pre-commissioning check. Verification of as-built documentation.

LLC «ZapSibNeftekhim»

Engineer of electrical works in Construction Team

С 01.01.2015 по 01.12.2016 (1 год 11 месяцев)

• Coordination with other professionals • Quality control of executed works • Ensure the implementation of procedures to identify risks, their analysis and evaluation of all types of hazardous work • Check that all the necessary permits to carry out works contractors • Checking of work procedures, appropriate work permits and documents on the analysis of industrial safety • Provision of the construction manager reports about the risks in the area of health, safety and environmental • Participation in the preparation of weekly reports on the progress of work • Verification of compliance of works with the approved drawings and specifications • Acceptance of the executed works contractors • Check the project documentation for the detection of errors and inconsistencies of the Russian Federation standards • Collaborate with the experts of the company Linde (Germany Installation of earthing systems and cathodic protection. Checking of technical and as-built documentation. Collective work with “Linde” specialists.

LLC «Rusvinyl»

Electrical engineer of Technical Supervision Department, Pre-commissioning works engineer.

С 01.10.2012 по 01.12.2015 (3 года 2 месяца)

Quality Control and verification of compliance with the design. Check of as-built documentation. Execution of works within the integrated team together with “Technip”. Installation of power transformers 220-35 kV, installation of “Alstom” “SIEMENS” HV switches 220 and 35 kV. Mounting of HV cables 220 kV and HV cable connectors. Installation of overhead lines 35 kV • Coordination with other professionals • Quality control of executed works • Ensure the implementation of procedures to identify risks, their analysis and evaluation of all types of hazardous work • Check that all the necessary permits to carry out works contractors • Checking of work procedures, appropriate work permits and documents on the analysis of industrial safety • Provision of the construction manager reports about the risks in the area of health, safety and environmental • Participation in the preparation of weekly reports on the progress of work • Verification of compliance of works with the approved drawings and specifications • Acceptance of the executed works contractors • Check the project documentation for the detection of errors and inconsistencies of the Russian Federation standards

LLC « Promsvet»

Deputy technical director

С 01.11.2011 по 01.11.2012 (1 год)

Iinstallation works on compressor station-03 «Vyaznikovskaya» of OJSC «Gazprom». As-built documentation preparation and hand-over.

Образование

Университет

Nizhny Novgorod State Technical University

Владение языками

Родной язык

Русский

Иностранные языки

Английский

Дополнительно

Ключевые навыки

  • Ms office

  • teambuilding

  • водительское удостоверение категории b

  • Владение ms excel

  • Autocad electrical

  • quality control

  • Total cost management nuclear construction

  • oil and gas

  • commissioning

  • instrumentation

  • lng

  • lng plant

  • substation

  • high voltage

  • power plants installation

Дополнительная информация

sociable, efficient, self-organized, easy to learn, ready to take the responsibility. 5 group of electrical safety NOSTROI C-52-175355

Похожие резюме

#

до 35 000 ₽

33 года

Кстово

Полный день

Последнее место работы

Филиал НОПО "Центр кадровой подготовки", Секретарь руководителя, август 2011 - февраль 2012

Обновлено

11.11 в 09:01

Был на сайте

Более недели назад

Опыт работы

16 лет 2 месяца

#

до 130 000 ₽

47 лет

Кстово

Полный день

Последнее место работы

АО "Транснефть Верхняя - Волга", Инженер по КИПиА 2 категории, июнь 2008 - по настоящее время

Обновлено

06.11 в 03:05

Был на сайте

Более недели назад

Опыт работы

49 лет 1 месяц

#

до 150 000 ₽

48 лет

Кстово

Полный день

Последнее место работы

ООО АИС, Генеральный директор, февраль 2003 - по настоящее время

Обновлено

21.10 в 06:02

Был на сайте

Более недели назад

Опыт работы

43 года 4 месяца