Для открытия контактов резюме необходимо приобрести доступ к базе
Не указана
Гражданство
Казахстан
Тип занятости
Полная занятость
Мужчина, 31 год, родился 26 декабря 1992
Город: Караганда
Опыт работы
10 лет 10 месяцев
TCO
Automation/Process Control Engineer
С 01.10.2021 по настоящее время (3 года 2 месяца)
Allen Bradley PLC Engineer
TCO
Automation/Process Control Engineer
С 01.10.2021 по настоящее время (3 года 2 месяца)
Allen Bradley PLC Engineer
Fircroft Engineering Services Limited
PLC Engineer
С 01.07.2021 по 01.10.2021 (3 месяца)
Allen Bradley PLC Engineer
"iQSEngineering" LLP
Automation Engineer
С 01.07.2020 по 01.07.2021 (1 год)
• Allen-Bradley ControlLogix PLC system maintenance and technical support • Modification of HMI displays on Factory Talk View Site Edition • Have taken tutorials on Honeywell ControlEdge, Experion HS, MasterLogic • Data acquisition from Krohne levelmeters and flowmeters via Modbus RTU protocol • Knowledge of protocol conversion equipment (Moxa Mgate series, ICPCON HRT-711) • Development of SCADA system on customer’s site (Ayrankol oil field) using Honeywell Experion PlantCruise R510 Platform • Developing PLC programs to collect data from a field using Honeywell ControlEdge PLC, Honeywell ML50 PLC (flow-, level-, temperature-, pressure-transmitters) • Developing PLC programs to PID-control analog valves to maintain required level of liquid in a tank (Biffi, Rotork) • Developing PLC programs to control VFD through Modbus RTU protocol
KazCenterNaladka LLP
Automation Engineer
С 01.10.2019 по 01.07.2020 (9 месяцев)
• Low-voltage VFD installation, commissioning and maintenance (Mitsubishi VFD of A800, A700, and F700 models; Schneider Electric VFD of Altavir 31 and 312 series) • creating maintenance procedures of control system on customer’s site • planning and undertaking scheduled maintenance of control systems • responding to breakdowns on customer’s site (Balqash Copper Concentrating Plant, Nurkazgan Copper Mine) • installation of software for Mitsubishi PLC programming (GX IEC Designer, GX Designer, GX Works 2, GX Works 3, FX Configurator, GT Designer) • provide reliable communication networks (Industrial Ethernet, Profibus) • designing PLC/HMI&SCADA control systems (Allen Bradley – ControlLogix, FactoryTalk; Schneider Electric – Wonderware InTouch;) • troubleshooting communication networks, Allen Bradley PLC and HMI • troubleshooting conveyor’s safety relay system (DuplineSafe) by Carlo Gavazzi • studying Mitsubishi PLC (programmable logic controller) programming (FX5U, FX3U, Alpha) • human-machine interface (HMI) development for Balkhash Copper Concentrating Plant on Wonderware InTouch by Schneider Electric
KazCenterNaladka LLP
Automation Engineer
С 01.05.2017 по 01.09.2018 (1 год 4 месяца)
• Low-voltage VFD installation, commissioning and maintenance (Mitsubishi VFD of A800, A700, and F700 models; Schneider Electric VFD of Altavir 31 and 312 series) • creating maintenance procedures of control system on customer’s site • planning and undertaking scheduled maintenance of control systems • responding to breakdowns on customer’s site (Balqash Copper Concentrating Plant, Nurkazgan Copper Mine) • installation of software for Mitsubishi PLC programming (GX IEC Designer, GX Designer, GX Works 2, GX Works 3, FX Configurator, GT Designer) • provide reliable communication networks (Industrial Ethernet, Profibus) • designing PLC/HMI&SCADA control systems (Allen Bradley – ControlLogix, FactoryTalk; Schneider Electric – Wonderware InTouch;) • troubleshooting communication networks, Allen Bradley PLC and HMI • troubleshooting conveyor’s safety relay system (DuplineSafe) by Carlo Gavazzi • studying Mitsubishi PLC (programmable logic controller) programming (FX5U, FX3U, Alpha) • human-machine interface (HMI) development for Balkhash Copper Concentrating Plant on Wonderware InTouch by Schneider Electric
Kar-Tel LLP (TM Beeline)
Electrical Engineer
С 01.05.2015 по 01.06.2016 (1 год 1 месяц)
• installation of power converters • checking contractors’ work • planning and undertaking scheduled maintenance on base stations • responding to breakdowns on base stations • repairing rectifiers • battery maintenance
Siemens LLP
Technician
С 01.06.2014 по 01.07.2014 (1 месяц)
• assembly of relay protection terminals
Образование
Университет
The University of Edinburgh
Университет
Almaty University of Power Engineering and Telecommunications
Университет
FPGA
Университет
AutoCAD Electrical
Университет
Allen Bradley PLC Programming
Университет
STEP4pro
Университет
Оборудование IEK
Университет
IELTS 7.0
Владение языками
Родной язык
Казахский
Иностранные языки
Английский, Русский
Дополнительно
Ключевые навыки
Ms office
Знание прикладных программ: microsoft office (word, excel, powerpoint), autocad, компас
mathcad.
Плис, цос, soc, vhdl, system verilog, rtl, matlab, c/c++, stm32, микроконтроллеры
ltspice
critical thinking
Computer troubleshooting
problem solving
ability to learn profoundly
Дополнительная информация
• Sport: judo • Music: dombyra (kazakh national instrument), guitar • Reading: Islam, detective and adventure fiction • Other: right now I have an idea and passion to develop an inverted pendulum system based on Arduino, home automation
Похожие резюме
Не указана
29 лет
Караганда
Полный день, Гибкий график, Удаленная работа
Последнее место работы
Нурбанк, АО, Менеджер по продажам кредитных продуктов, август 2014 - декабрь 2015
Обновлено
17.10 в 04:17
Был на сайте
Более недели назад
Опыт работы
11 лет 5 месяцев
до 350 000 ₽
26 лет
Караганда
Полный день, Гибкий график, Удаленная работа
Последнее место работы
АО Казахтелеком, Системный администратор, май 2019 - июль 2019
Обновлено
06.12 в 15:04
Был на сайте
Менее недели назад
Опыт работы
5 лет 4 месяца
Не указана
46 лет
Караганда
Полный день, Гибкий график, Удаленная работа
Последнее место работы
АО "Шубарколь комир", Инженер по охране труда, ведущий инженер по охране труда, заместитель начальника службы охраны труда, август 2008 - ноябрь 2016
Обновлено
28.10 в 17:58
Был на сайте
Более недели назад
Опыт работы
19 лет 2 месяца