Для открытия контактов резюме необходимо приобрести доступ к базе
Не указана
Гражданство
Казахстан
Тип занятости
Полная занятость, Проектная работа/разовое задание
Мужчина, 38 лет, родился 21 февраля 1987
Город: Атырау
Опыт работы
12 лет 10 месяцев
Bolashak Atyrau, ТОО
Projects Control Manager
С 01.03.2024 по настоящее время (1 год 2 месяца)
Currently, I am working for CCT Atyrau company as a Project Controls Manager, through the Bolashak Atyrau agency. At the moment, we are working with large companies as TCO, KPO to provide services such as the supply of metal structures and module structures at the Aksai field. The new scope on the construction of the gas pumping plant at Eskene has also begun. other information will be provided during the interview. Risk assessment Local Content
Bolashak Atyrau, ТОО
Projects Control Manager
С 01.03.2024 по настоящее время (1 год 2 месяца)
Currently, I am working for CCT Atyrau company as a Project Controls Manager, through the Bolashak Atyrau agency. At the moment, we are working with large companies as TCO, KPO to provide services such as the supply of metal structures and module structures at the Aksai field. The new scope on the construction of the gas pumping plant at Eskene has also begun. other information will be provided during the interview. Risk assessment Local Content
CASPY ENGINEERING LLP. CASPIAN EXPERTS JOINT VENTURE
PROJECT ENGINEER
С 01.02.2023 по 01.09.2023 (7 месяцев)
PE Activities. TCO, NCOC, KPO projects
CASPY ENGINEERING LLP. CASPIAN EXPERTS JOINT VENTURE
SENIOR PROJECT CONTROL ENGINEER
С 01.02.2022 по 01.01.2023 (11 месяцев)
CASPY ENGINEERING LLP / CASPIAN EXPERTS JOINT VENTURE LLP. SENIOR DOCUMENT CONTROLLER / PROJECT CONTROL CLIENT: NCOC N.V. Kazakhstan, Atyrau KASHAGAN PHASE IIA PROJECT - PROVISION OF FEED SERVICES • D-ISLAND TIE-INS AND DEBOTTLENECKING (DBN) PLANT MODIFICATIONS, • GAS PIPELINE FROM D-ISLAND TO SHORE, • MODIFICATION TO EXISTING SLUG CATCHER, • GAS PIPELINE FROM BOLASHAK OPF TO 3RD PARTY PLANT, AND • BOLASHAK OPF DEBOTTLENECKING PLANT MODIFICATIONS TCO SMALL CAPITAL PROJECTS. Responsibilities: DCC duties: • Compliance with labor and performance discipline, health and safety requirements / Company policy and Procedures • Preparing reports and analysis on the preparation and approval of closing documents; • Quality check (check revision/contract number/revision description) of documents/drawings before to issue to client, register in database, prepare distribution, email notification to send for review to client. • Ensure that copies of all correspondence and documents, incoming and outgoing, are allocated correct file numbers and included in the central filing system • Closely communication with the client and ensuring that all deliverables are according to required procedures and processes • Providing timely and effective information, communication and reporting on Information Management and Document Management activities to the Project Management • Understand and implement all NCOC Standards, procedures • Supporting Business Partners (ILF, Doris) with DCC activities • Manage and traceability each revisions and numbering structure. • Closely working with project Engineering dept to track the progress per each CTRs • Close cooperation with the TPD department of the project on compliance with the RoK requirements • Other daily tasks / tasks from Management Project Control duties: • Supporting on development of Project Execution Plan, Cost and Schedule Procedures, Risk Management and Stakeholder Management plans. • Collecting project data, tracking progress per forecasted and actual plan • Supporting / updating the Cost Report (Actual – Forecast VOWD). • Closely working with Project Cost Control, Planning Control dept. • Supporting / updating Budget Control / Manpower Plan • Updating and processing the weekly man-hour reports (for Doris Engineering / ILF Engineering / Caspy Engineering) • Coordination and updating of Man-power Plans / tacking of spent and remaining hours (budget control) • Development, updating, collecting and processing weekly timesheets (for Doris Engineering / ILF Engineering / Caspy Engineering) • Preparation and submission of timesheets for the client approval • Development and release of CVs / PAFs (Personnel Approval Form). Updating the register (tracking/storage/release) • Preparation of Weekly Progress reports • Preparation / updating of risk register and risk assessment matrix. • Supporting on a LC (local content) forms updates (collecting data from BPs) • Supporting Business Partners with Project Controls activities • Supporting / updating the organizational charts, staffing plan as per approved PAFs • Monitoring and supporting projects within the agreed deadlines, within the allocated budget and with the required level of quality. Organizing the implementation of projects in accordance with the work plan. • Managing the process of obtaining the initial data with the approved scope of work for the design. • Daily tasks from Management
ILF CONSULTING ENGINEERS LLC
LEAD DOCUMENT CONTROLLER
С 01.04.2020 по 01.10.2021 (1 год 6 месяцев)
ILF CONSULTING ENGINEERS LLC LEAD DOCUMENT CONTROLLER / PROJECT CONTROL ENGINEER CLIENT: TCO – TENGIZCHEVROIL LLP, KAZAKHSTAN (ATYRAU / TENGIZ) KEY PROJECT DATA: PRE-FEED, FEED, DETAILED ENGINEERING, ENGINEERING SUPPORT DURING CONSTRUCTION AND FOLLOW ON ENGINEERING RELATED TO THE TCO’S FACILITIES. PROJECTS: TENGIZ PRIMARY DISTRIBUTION SUBSTATION PROJECT (TCO) IB POTABLE WATER TANKS UPGRADE (TCO) LIQUID MUD PLANT PROJECT (TCO) [BID STAGE] KTL SWITCHGEAR UPGRADE PROJECT (TCO) [BID STAGE] LCR HVAC UPGRADES PROJECT (TCO) [BID STAGE] CLIENT: URALSK OIL AND GAS LLP. PROJECT: UOG ROZHKOVSKOE FEED SURHAN GAS PLANT PROJECT (UZBEKISTAN) Responsibilities: DCC Lead Duties • Developed document control and project control procedures, communication procedure, Action item procedure, technical query etc. • Ensure that the selected Document Control System (SharePoint) is fully populated with the latest revision of all documents • Support the Vendors and client in ensuring the Information Management process is fit for purpose • Closely communication with the client and ensuring that all deliverables are according to required procedures and processes • Providing timely and effective information, communication and reporting on Information Management and Document Management activities to the Project Management • Supervise team of Document Controllers (2 subordinates), assign tasks and teach for future grows • Develop the IT and archiving systems necessary to support the IM function • Company system improvements (new tools for share point) • Storage of confidential leveled documentation • Tracking / assigning / issuance of official letters • Daily tasks from Managing Director • Other duties as assigned. Project Control Duties • Preparation of CTRs for the client Review (Cost Time Resources) • Coordination with Planning Dept. working on calculation of the actual percentage of work completion on the planned / forecasted periods. • Calculates earned man-hours from the Deltek ERP and preparation of summary reports; • Develops and delivers graphical and tabular reports with Cost Control dept. • Coordination of Project control and project progress with Planning dept in accordance with the approved TCO milestones (TCO TPDS MCP project). • Conducting internal audit with QHSE Manager • Development and Implementation of an internal procedures with ILF HQ • Analyze and evaluate any deviation from the established plans and procedures • Daily tasks from Managing Director
SENIMDI KURYLYS LLP
LEAD SYSTEM COMPLETION ENGINEER
С 01.12.2019 по 01.03.2020 (3 месяца)
SENIMDI KURYLYS LLP. LEAD SYSTEM COMPLETION ENGINEER TCO FGP / 3GP PROJECT. 3GI / 3GP / GATHERING Responsibilities: • Organization and chairing of pre-inspection meetings • Review Drawings, supplier’s documentation. Create subsystems per Tag’s QVDs. • Review suitability of vendors and Reports • Review all Drawings and Documents are approved for use at Site • Prepare (RFI) NFI and send to Client with all relevant documents • Prepare Internal Punch lists and coordinate to close all items • Have an overall understanding of FGP Project Execution plans, procedures and turnover processes and project schedules. Identify and develop the delivery validation Work Processes and Procedures for PSI/As-built deliverables required for a perfect Handover and Start-up. • Work closely with 3GP Engineering teams to align the work processes for the verification of completion of PSI and As-built documents in FGP CMS (Completion Management System Tool). • Lead and work with Project teams (3GP Engineering, Supply Chain Management, Systems • Completion, Operations and Maintenance, Regularity Affairs etc.) and TCO Base Business Facility
KENTECH KAZAKHSTAN TECHNICAL SERVICES LLP
DOCUMENT CONTROL SUPERVISOR
С 01.12.2018 по 01.09.2019 (9 месяцев)
FIRCROFT ENGINEERING, LLP. LEAD DOCUMENT CONTROLLER / PROJECT CONTROL MAJOR CAPITAL PROJECT TCO, SECOND GENERATION ENHANCEMENT PROJECT SUBPROJECTS: • SGI COMPRESSOR RE-WHEELING PROJECT • SGP E219 KETTLE REBOILERS • SGI/SGP CAPACITY & RELIABILITY PROJECT • SGI LIQUIDS HANDLING PROJECT • UNIT 200 CRUDE RUNDOWN PROJECT • PU-760 CAUSTIC CARRYOVER ELIMINATION • UNIT 200 PRODUCED WATER HANDLING • HP STEAM BOILER PACKAGE Responsibilities: • Preparation of Weekly Progress reports for Project Management. Provision of status of major capital project, such as number of installed modules, installed steel, erected mechanical equipment, pipe installation, and electrical wire & cable. • Develop, implement and manage an Information Management and Document Control Plan for the Project • Developed responsibility assignment matrix of Project Controls department, ensured timely project deliverables review and approval by leads, senior and discipline engineers. • Ensured quality of daily and weekly progress reports, monthly cost reports • Monitored and controlled mitigation actions and ensured timely implementation of corrective activities. • Prepared a risk register and risk assessment matrix. • Responsible for day-to-day document administration including but not limited to timely deployment of relevant information to the project team, correct control and distribution of information to contractors, vendors, and operations • Control the Project Documentation / Coordinate DCC dept • Coordinate daily work activities of the SGE DCC team in Atyrau and Tengiz. • Ensure that all Documents flowing through TCO SGE DCC have Proper Approvals • Interface with TCO Information Management Center (IMC) to resolve documentation and system queries • Understand and implement all TCO Standards and TCO SGE procedures • Assist other project areas/visitors with inquiries as related to the daily DCC functions, including supporting special requests, general information • Ensure all work is performed per department and project procedures and is completed in a manner that supports Project priorities. • Arrange the Meetings with IMC and CSS group to be ensure a completely handing over the Project documentation to Base Business. • Review project drawings and identify any changes from original project scope, develop cost and schedule impacts, recheck and updated quantities of any works, implement this changes by CWE’s and AWE’s; • Review, comment and approve all Project Control outputs; • Provide to Client Monthly cost reports, Change register log, Monthly interim payment applications with all supporting documents. • Develop and update Project Schedules; • Other duties as assigned.
TENGIZCHEVROIL LLP. FIRCROFT ENGINEERING LLP
LEAD DOCUMENT CONTROLLER
С 01.06.2016 по 01.07.2018 (2 года 1 месяц)
FIRCROFT ENGINEERING, LLP. LEAD DOCUMENT CONTROLLER / PROJECT CONTROL MAJOR CAPITAL PROJECT TCO, SECOND GENERATION ENHANCEMENT PROJECT SUBPROJECTS: • SGI COMPRESSOR RE-WHEELING PROJECT • SGP E219 KETTLE REBOILERS • SGI/SGP CAPACITY & RELIABILITY PROJECT • SGI LIQUIDS HANDLING PROJECT • UNIT 200 CRUDE RUNDOWN PROJECT • PU-760 CAUSTIC CARRYOVER ELIMINATION • UNIT 200 PRODUCED WATER HANDLING • HP STEAM BOILER PACKAGE Responsibilities: • Preparation of Weekly Progress reports for Project Management. Provision of status of major capital project, such as number of installed modules, installed steel, erected mechanical equipment, pipe installation, and electrical wire & cable. • Develop, implement and manage an Information Management and Document Control Plan for the Project • Developed responsibility assignment matrix of Project Controls department, ensured timely project deliverables review and approval by leads, senior and discipline engineers. • Ensured quality of daily and weekly progress reports, monthly cost reports • Monitored and controlled mitigation actions and ensured timely implementation of corrective activities. • Prepared a risk register and risk assessment matrix. • Responsible for day-to-day document administration including but not limited to timely deployment of relevant information to the project team, correct control and distribution of information to contractors, vendors, and operations • Control the Project Documentation / Coordinate DCC dept • Coordinate daily work activities of the SGE DCC team in Atyrau and Tengiz. • Ensure that all Documents flowing through TCO SGE DCC have Proper Approvals • Interface with TCO Information Management Center (IMC) to resolve documentation and system queries • Understand and implement all TCO Standards and TCO SGE procedures • Assist other project areas/visitors with inquiries as related to the daily DCC functions, including supporting special requests, general information • Ensure all work is performed per department and project procedures and is completed in a manner that supports Project priorities. • Arrange the Meetings with IMC and CSS group to be ensure a completely handing over the Project documentation to Base Business. • Review project drawings and identify any changes from original project scope, develop cost and schedule impacts, recheck and updated quantities of any works, implement this changes by CWE’s and AWE’s; • Review, comment and approve all Project Control outputs; • Provide to Client Monthly cost reports, Change register log, Monthly interim payment applications with all supporting documents. • Develop and update Project Schedules; • Other duties as assigned.
TENGIZCHEVROIL LLP. Kis/Orion LLP
LEAD DOCUMENT CONTROLLER
С 01.04.2014 по 01.06.2016 (2 года 2 месяца)
KIS/ORION, LLP. LEAD DOCUMENT CONTROLLER / PROJECT CONTROL TCO, SECOND GENERATION ENHANCEMENT PROJECT Responsibilities: • Work closely with the dept to provide day-to-day document administration • Assign TCO Project Transmittal Number and File Number According to TCO Standards, Log into Database • Print and Check Transmittals from Contractors for Completeness of the Attached documents • Accept Project Electronic Files Received from Outside Contractors • Check Document Correctness (Project. No, Doc. No, Drw. No, DS No, revision and etc) • Make Soft Copy of the Documents. Print and Plot Drawings and Documents. • Scan Project Drawings and Documents, Staff Documents • Distribute according to TCO SGE Distribution Matrix • Ensure that all Documents flowing through TCO DCC have Proper Approvals • Interface with TCO Information Management Center (IMC) to resolve documentation and system queries • Understand and implement all TCO Standards and TCO project procedures • Assist other project areas/visitors with inquiries as related to the daily DCC functions, including supporting special requests, general information • Ensure all work is performed per department and project procedures and is completed in a manner that supports Project priorities • Consult with PM if there are questions / concerns / suggestions etc. • Work with IMC to hand over all completed Project deliveries
SENIMDI KURYLYS LLP
PROJECT DOCUMENT CONTROL SPECIALIST
С 01.03.2011 по 01.10.2013 (2 года 7 месяцев)
SENIMDI KURYLYS LLP PROJECT DOCUMENT CONTROL SPECIALIST SK / TCO, BASE BUISINESS Responsibilities: • Quality check (check revision/contract number/revision description) of documents/drawings before to issue to client, register in database, prepare distribution, email notification to send for review to client. • Filing of all project documentation (Job packs, drawings, SEQs (site engineering query), ITCs, Change orders). • Ensure they are properly drawn up, assigned reference number and signed by authorized person and deliver them with SK transmittal sheet to confirm document receipt by related addresses. • Ensure that copies of all correspondence and documents, incoming and outgoing, are allocated correct file numbers and included in the central filing system Supply our site supervisors and engineers with requested project documentation properly stamped
SENIMDI KURYLYS LLP
DOCUMENT CONTROL ASSISTANT
С 01.04.2010 по 01.02.2011 (10 месяцев)
Base Business activities
Образование
Университет
Kazakhstan. Almaty. University "Kainar".
Университет
• “Negotiation skills” training course • Facility access • Safe Work Performance / Safe a Life • First AID • Industrial Safety and Occupational Safety • Floor warden • Driving license (B, C) • TCO Way; • TCO Policies and Procedures; • Competency standards for the position; • TCO Operational Excellence management system; • TCO Process Safety Management Practices and safety procedures and practices; • IT/IM Governance; • CSS Governance.
Владение языками
Родной язык
Казахский
Иностранные языки
Английский, Русский, Ту?
Дополнительно
Ключевые навыки
Ответственное хранение
контроль исполнения решений
Дополнительная информация
KEY QUALIFICATIONS 11+ years of experiences with demonstrated history of working in Oil & Gas Construction & Commissioning projects. Had an experience in working with a multinational people. Easily get along with new environment and people. Skilled in Microsoft office and Project Document Management systems: Successfully handed over the major capital TCO Projects to TCO Operation with upper quality and in time manner. Have a lot of Certificates from the TCO Management - “The Best Employee of the Year”; "System troubleshooting", "TCO Document Control Advisor" etc. • Core Worx [POL]; • MC Plus; • EB system; • QDMS • EDMS • SharePoint; ViewPoint; AppBox.com ; Drop.box; • CMS - Completion Management System • AutoCAD • eBentley Microstation v8i. • Docloader • Documentum • D2 (TCO Documentum system) • Primavera P6 iDeDoc